Showing posts with label scarves. Show all posts
Showing posts with label scarves. Show all posts

Friday, January 18, 2013

Clockwork

I really do have tons to share from January already, just nothing finished. Nevertheless, my procrastination about photographing and posting an old finished project means I have something to share for FO Friday.



Pattern:  Clockwork by Stephen West
Yarn:  Three Irish Girls Kells Sport in Roisin and Winter Birch
Needles: US size 6
Cast on:  August 18, 2012
Finished: October 2012
Ravelry Project Page
Mods:  10 garter stripes instead of 12

Ah, Clockwork, you were a long time coming. You threw off my plan for awhile with that that pesky 420 yards of main color instruction, but it was only a year and a half later that I realized the way around that was just to make you thinner.  I managed to squeak by with my paltry 330 yards of main color (and about 220 of the contrast) by reducing the number of stripes in each section from 12 to 10.  The scarf is still plenty wide, methinks.


All in all, not the scarf of my dreams, but it's fine, already been worn several times, and used up a skein that had been sitting unloved in the stash drawer for the last several years. Not to mention, I really did enjoy knitting this scarf.  I have a new-found love of garter stitch--so plush and squishy!  Forget the cables and fancy lace, I just want to wrap up in garter stitch.  Hmm, maybe I should knit a garter afghan or two. 

Visit Tami's for more FO Fridays!

Wednesday, January 16, 2013

December Catch Up

As usual, I have weeks to catch up on so let’s skip the whole 2012 year-in-review thing and the inevitable 2013 resolution post (at least for now) and go straight to the yarny stuff.

No, I have not been gone for weeks because I died under a pile of smittens, but I did keep going with them for at least a few more days.


After smitten #10, I was able to conquer the obsession  (okay, fine, I started running out of appropriate handspun leftovers).  A day or so after I cleared my head from the smitten haze, I started back on my WIPs and the rest of December actually ended up being rather productive.  First up, I almost finished a sweater.


Yes, it's an odd picture, but the sleeve cuffs (can you call 8 inches a cuff?) are the coolest thing about the sweater so there ya go.  I totally could have been wearing this one for Christmas had I planned a little better when I bought this yarn for a completely different project over two years ago and psychically realized I was going to change patterns and probably needed one more skein.  For a couple of nights, I played the "maybe if I knit fast enough, I can finish before the yarn runs out" game.  Then I came back to reality, weighed my yarn, and admitted there was no way that what I had left would get me through the second sleeve.  I hunted up and ordered an extra skein, but was forced to put the sweater aside to save my remaining yarn so that I could alternate it with the new skein.  MadTosh is not exactly known for consistent skeins even when you buy them together, and two years apart?  Yeah, I was just hoping it was still some shade of grey.

Forced to abandon the sweater, a funny thing happened.  I was hit with strange motivation to knit my heart out and finish a pair of socks that were intended to be a Christmas gift--an idea I had long ago given up on since the first sock wasn't even completely finished.  This motivation hit on Dec. 22nd.  Nice timing, right?  Here is what the next three days looked like:


Yup, I said it, BAM!  I knit the entire second sock in two and a half days.  Yes, I know there are awesome knitters out there that can bust out a pair in the same amount of time, and yes, I realize these aren't exactly tall socks, but whatever, a sock in three days is about as good as it's ever going to get for this fickle knitter.

With the socks finished, I had the drive back from Connecticut to Maryland free to turn back to the handspun projects.  Relaxing on the couch after we got home, I finished up the Lacy Baktus scarf.

 

A few days and three different bind-offs later, Mike's socks made their way to the finished pile.


Then I threw some handspun on the loom and busted out a scarf for no particular reason.

  
And yet, I still wasn't quite finished.  I managed to squeeze one more skein of handspun and most of a hat in before the calendar hit 2013.


I tried to spin bulky yarn.  I mostly failed.  And while I love, Love, LOVE the hat pattern (Squall by Glenna C.),  I do not love how it looks with the color variation so the yarn is destined for another project.  Still, I enjoyed the hell out of myself knitting it, so it's all good.

And there's the December crafting.  Phew!  I'll try to get January in before we hit February!

Wednesday, August 22, 2012

Work-in-Progress Wednesday: Clockwork

The road of self-discovery was rather humbling this week.

Lesson 1:  I am not in the kick-ass shape I imaged.  Not exactly a news flash since I’ve been slacking since June, but even though I can boast completing a marathon and a half-Iron distance triathlon in the last six months, when confronted with the Insanity workout DVDs, I still collapsed on the floor in heap of sweat while gasping for air.  My quads feel like lead, and stairs are not my friend.  Oh yeah, and I’m only on day 2 of 60.  It’s going to be a long 2 months.

But you guys don’t really care about that right?  You’re here for the knitting.  That brings me to:

Lesson 2:  I AM AN IDIOT

Ages ago I planned to knit Clockwork, bought the pattern, and then whined when I realized I didn’t have as much yarn as the pattern called for.  Anyone remember that pity-party?  Apparently I needed 16 months of continuing to daydream about a red and cream Clockwork to come to the ridiculously obvious conclusion that it’s just a scarf knit lengthwise, and I could knit a narrower version.  Seriously, it took 16 months for that to occur to me.  Within hours of my monumental epiphany, the pattern was printed, yarn was wound, and Clockwork was in progress.


With the easy Citron project wrapped up and Laika currently acting like a black-hole of knitting, Clockwork is my new go-to project.  Is it all I hoped and dreamed?  No idea yet, but I'm enjoying it so I'm not stressing about the end result. After weeks of laceweight yarn and size 2 needles for Laika, I'm absolutely loving sportweight and size 6.  I thought I’d be further along after spending 10 hours at a dog agility event on Saturday, but the day was hectic and I was exhausted. Juno too.


Despite the blue ribbon, it was not one of our better days--only 2 clean runs of 5.  I think we were both hot, tired, and out of sorts.  Hiking and swimming with Rugby on Sunday was more her speed.  Wet dirty dogs are happy dogs!


Happy dogs will still refuse to look at the camera though. 

Visit Tami’s for more WIPW!