Friday, July 25, 2014

Baby Tea Leaves

Whoa, it's been awhile since I've finished a knitting project.  I believe this is my first "finished object Friday" of 2014.  Of course, this is only my 4th post of 2014.  Knitting and blogging have sadly been a little further down on the priority list than usual, but at least I managed to churn out a cute baby sweater! And even managed to finish it up before the baby was born.

Pattern:  Baby Tea Leaves by Melissa LaBarre
Yarn:  Madelinetosh Pashmina, "Robin Red Breast"

It's an adorable little sweater.  I've always admired the adult version but something about doubling the number of stitches to knit the runched sections always deterred me (not to mention my lack of sweater knitting lately, but that's another story).  Baby runched sections went quickly enough that I finished them before I had time to start getting annoyed.

The good stuff:  It's cute, I finished something, and Madtosh Pashmina is really lovely to knit with and makes a beautiful finished object.  Soft with a little sheen and nice drape.  No clue how it will hold up for a baby, but the little one will probably outgrow it before it makes it out of the wash.

And of course, awesome buttons from Jennie the Potter:


In retrospect, I think white buttons on a red sweater is a little too much contrast, and if I could do it over, I might have done a white sweater with some red trim.  Something to think about if I decide to use the 3 leftover buttons for a new project.

Sunday, June 15, 2014

It's going to be EPIC

Eagleman 70.3 is behind me.


To make a long story short, I felt great on the swim, fine on the bike, and the run was a brutal slog through the sixth level of hell.  Even with temperatures relatively mild in the low 80s, the sun beating down on me for 13 miles was a killer.  And although helpful, it ain’t much fun trying to run with cups of ice bouncing around in your sports bra.  In the end, I crossed the finish line after 6 hrs, 10 min, and 50 sec of swim, bike, run, which was 41 minutes faster than 2012, so no complaints.  I think Mike and I are pretty much done with Eagleman though.  There are only so many times you can fork over money to race in misery before you start to come to your senses.

And now looming ahead is only the big bad of Ironman Mont Tremblant. Nine very short weeks away.  I am both super excited and scared out of my mind.  I've come a really long way in the last five months but there's still pretty far to go before I'll be ready to try to cover 140.6 miles.  Distance starting building this week, and 73 miles on the bike and 16.5 of running will take a pretty big chunk out of the weekend.  Vacuuming, laundry, walking dogs, and spending an hour tonight making stuffed cabbage (yeah, weird impulse for June cooking, no explanation) and there is little time left to relax with knitting.

So, in honor of big epic undertakings (and the fact that I've barely worked on any knitting in the past week), I decided it was finally time to update my progress on the handspun afghan. To give some background, I started this project in 2011. Over the years, I bought 15 4oz braids of blue faced leicester fiber, spun a worsted 2-ply yarn, and knit each skein into a log cabin square.  Sometime last year I finished knitting the last square.


I was so excited about finishing the squares that I shoved them in a drawer and didn't think about them for months.  In March, I finally dug them out, bought black yarn, and started knitting.  A couple months and a whole lotta garter stitch later:


All the squares are assembled.  Only the outer borders are left.  I'm so close and yet there is still a good bit of knitting to go.  Knitting that I have no intention of touching for months.  The blanket weighs a metric crapton and there is no way I'm going to sit with the whole thing on my lap to knit the borders until there is frost outside.  Since it's not even summer yet, that's going to be awhile.  Thank goodness I have hours of bike training to keep me busy.  To be continued...maybe in October...  

Friday, June 6, 2014

Buttons to the Rescue

Two years ago, I finished my first (and only) half-iron triathlon, and tomorrow I will head back to Cambridge, MD to race Eagleman again on Sunday.  I’m sure I was a basket of nerves last time, but unlike 2012, this year I am not undertrained.  Weather conditions are not predicted to be the sweltering inferno of years past, and I have absolutely zero doubts that I can cover the distances and finish the race. You’d think I'd be a tad more relaxed, right?  Yeah, you’d be wrong.  My stomach is tied up in knots because I’m nervous about whether I’ll meet expectations.  Yup, that's really what's on my idiot mind today. And it's not even others' expectations, just my own. Talk about creating unnecessary drama.  

Anyway, all that was basically a long way of saying, I'm finally writing a blog post to get my mind off ridiculous race anxiety.  Because we all know that yarn solves all problems.  Or at least most.  

Despite how hectic life has become these days, I have managed to squeeze in a decent amount of knitting, spinning, and even some (gasp!) weaving.  I have tons to share, not to mention, extremely overdue posts about the Maryland Sheep and Wool Festival, but since I do need to actually pack and get ready to leave town, today is just about one wee baby sweater.  It's not often that I have occasion to knit baby items, but some friends recently announced they are expecting a little girl, and damn, if didn't want to leap all over the knitting opportunity.  Only problem is that I'm extremely picky when I knit for non-knitters.  I feel like the item has to be “OMG, amazing!” for it to be appreciated, and despite the thousands of baby sweater patterns on Raverly, nothing was grabbing me.  Me, indecisive?  Nah….

Sheep and Wool and Jennie the Potter to the rescue...because buttons! 


The couple are cycling friends, so come on, how perfect are these?  (I'm fairly certain I saw them on the Yarn Harlot's blog awhile ago, so yes, I'll own up that I'm really just a copycat)  The buttons made life a lot easier because immediately I knew I was knitting a red cardigan.  Of course, it is me after all, so don't think for a second that just because I settled on red, I'd have no problem deciding on yarn.  I, uh, ordered two different skeins because I couldn't make up my mind.  I will maintain, however, that the two skeins were due to concern about color misrepresentation on computer monitors and not indecision.  Yes.  Really.  


The caked skein sort of gives away which one I chose which is Madelinetosh Pashmina in Robin Red Breast (the other is Tosh Sport in Tart).   With light workouts this week to rest up for the race, I've gotten a nice start to a Tiny Tea Leaves cardigan.  


So so cute.  And tiny.  And damn, if baby sweaters don't go super fast.  But now I'm going to put away the happy distraction and actually go start packing the fourteen bags of crap I need for a triathlon.  Who came up with this stupid sport anyway?  Hmm...maybe one more row....

And I really really do have tons to share so I hope I’ll be back soon.  Sneak peak and proof crafting is happening!


Saturday, April 19, 2014

So it's been awhile...

Yeah, yeah, almost 5 months, yada, yada.   Kind of a lot has happened, both in the knitting/spinning realms of my life and the non-crafty part.  I’d love to write about all the details, but to quote a favorite character, “No, there is too much. Let me sum up”.  (And if that doesn't sound familiar, it's been too long since you've watched the Princess Bride.  I'd get on that.)

KNITTING:  Holy sock mojo, Batman.  I finished 4 pairs of socks in Nov-Dec of last year.


1.  Nutkin; Sweet Georgia Tough Sock "Tapestry"; project page
2.  Simple SKYP; Sanguine Gryphon Bugga "Oak Timberworm"; project page
3.  Improvised toe-up with 2x2 ribbed leg; My handspun (!); project page
4:  Annetrelac; Rainy Days Wooly Dogs "Flugelhorn"; project page

The autumn sock knitting mojo really came out of nowhere.  Stats illustrate this anomaly best:

Pairs of socks completed in 2012: 3
Pairs of socks completed Jan-Aug 2013: 1
Pairs of socks completed Sep-Dec 2013: 6?!

The sock obsession left as quickly as it swept in because the calendar turned to 2014, and I’ve got no socks on the needles and no plans to cast on any. At least a small dent was made in the sock yarn stash before the impulse wore off.

Only one other big knitting project: Trellis and Vine Pullover (Interweave Knits, Fall 2009)


I can't even remember exactly when I finished this one.  All I know is it was after September and before Thanksgiving.  Here’s the quick and dirty about the sweater: 
  • I ripped and reknit the bottom half after deciding to swap the lace/cable pattern for a hemmed edge. 
  • I ripped and reknit almost an entire sleeve when I decided it was coming out too big. 
  • All the reknitting must have been worth it because I wore it a ton this winter--it’s soft and super comfortable without being too warm and I adore it.  
  • Soft yarn comes with a price--the sweater already looks a little ratty from the pills.  You can even see in the picture if you look closely, so, uh, don’t. (Yarn is Berroco Palace, 50/50 merino/silk.  Lovely, but pilly)
And that about wraps up the knitting.  I have absolutely zippo to show for 2014.  Not one thing finished (save a pair of sample/test socks that I can’t show off yet), and not really much started either.  Who has time for knitting when there’s….

SPINNING:

I suck at keeping track of spinning so I have no idea what I worked on at the end of 2013, but the first few months of 2014 were pretty productive.  I joined a challenge where everyone selected a "bin" of fiber to spin in 2014. 

The bin:


Progress to date:


If you want details, visit my handspun page on Ravelry.  If you’re not on Ravelry, you probably don’t care about the details anyway.   I'm a little over halfway through the bin, which isn't bad for only being a third through the year.  Except, like knitting, spinning has started to slow considerably too.  There's a good reason for that:


That “big plan” I really wanted my foot to heal up for?  Yup, an Ironman triathlon in Mont Tremblant (near Montreal) in August.  And if you're not big into the tri scene, that means a 2.4 mile swim, 112 mile bike, and 26.2 mile run.  Yup, I’m crazy.  And nope, my foot is still not totally healed,  and I started Ironman training in January allowed to run only 30 second intervals at a time.  Lucky for me triathlon encompasses 2 other sports that I can spend loads of time on.  But that pretty much sucks because I enjoy running and sort of just tolerate the other 2 because the events are fun.  Oh, yeah, and it’s good for my body to diversify. Or something.  

Training is 6 days/week, with double workouts now on 2 weekdays, and lengthy weekend workouts which are only going to get longer.  Currently I'm at about 12-13 hours/week of swim, bike, run plus more time for strength training, driving to the pool or wherever I'm biking, stretching, icing sore feet, etc.  So, yeah, I'm neglecting the blog, knitting, and spinning.  Along with cleaning, shopping, brushing the dogs, and any laundry that isn't workout related.   

I'd like to say I'll be back soon, but, well, I'm not making any promises.  That said, I do have handspun epic afghan progress to share so there is at least some hope I won't fall off the Internet for 5 months again. 

Friday, October 25, 2013

FO Friday: Mittens!

It started with pretty fiber.

Fat Cat Knits Variegated BFL in "Let's Go Crazy"

The fiber became lovely squishy yarn.

275 yards of 2-ply

An impatient knitter bored with all her projects combined with an impulsive cast on and a few hours of knitting, and you get...mittens!

Pattern:  Warmest mittens on Raverly

I know I said I would work on WIPs for the next couple of months, but I really think these mittens need a matching hat.

Happy Friday all!  Visit Tami's for more FO Friday!


Wednesday, October 23, 2013

WIP Wednesday: Trellis and Vine Sweater

I thought that after eagerly finishing socks and mittens I would be on a roll to clear out more works-in-progress projects.  I was determined to finish stuff, and when I came down from my knitter's high of finished socks, I diligently turned to a sweater-in-progress.  My interest in that lasted only about a day.

Then I cast on a new Honey Cowl.


I cast on 240 stitches, very very carefully joined in the round, and started knitting. About six rows in I finally admitted that I had twisted my join.  I had tried to be so careful, but the cowl will have to be ripped out. 1500 wasted stitches. Obviously not tragic, but I'm taking it as a subtle nudge from the knitting gods: "go back to your WIPs".

Okay, done.  Back to my sweater project. 


This is the Trellis and Vine sweater by Carol Feller from an old Interweave Knits issue (Fall 2009, to be exact).  This sweater and I have already been through a lot of ripping and re-knitting. In August I ripped and re-knit about 5-6 inches of the body, and that finished sleeve you see?  Well, that's the second time I knit it. I think I've finally got all the issues fixed now, and with only half a sleeve left, this one is almost wrapped up.

Maybe a finished sweater will earn me new project blessings?  

Visit Tami's for more WIP Wednesdays!  And see you on Friday with mittens!

Friday, October 18, 2013

OppAtt Socks

All week I've been planning to post mittens today.  The mittens have been finished for days, and while I may not be doing back flips over them, they are very nice mittens.  Nice, but at least for today, neglected.

Instead....SOCKS!!

Pattern:  OppAtt by Jeannie Cartmel
Ravelry Project Page
Yarn:  Sanguine Gryphon Bugga! in Lubber Grasshopper
Needles: 2.5mm
Cast on: Oct 2
Bind off: Oct 18

I finished grafting the toes and weaving in ends during a conference call this morning.  Even though the second sock had been going rather quickly, I didn't expect to finish the pair until this weekend.  I was so excited to wrap them up this morning that the mittens had to take a backseat.

Happy things:
  1. I finished a pair of socks in 16 days.  That's huge for me.  The last time I knit a pair of socks in two weeks was probably 2010.  These were a nice reminder of a time when I used to get super excited about knitting socks.  I doubt I'll jump right back to busting out 10 pairs a year, but still, it's always nice to remember the good old days.
  2. The finished socks are all one color.  Even after the scale confirmed I was being ridiculous about envisioning socks with half the foot in different yarn, I was still convinced I would need to use different yarn for the toes.  Nope. Finished socks, plenty of yarn.
  3. I really never liked the first socks I knit with this yarn, and I hate waste.  Those socks in my drawer were a constant annoyance, and yet if you're a product knitter like yours truly, ripping out perfectly good finished socks is not easy to force yourself to do.  But I did it.  I have way better socks to show for that perseverance. 

Pattern notes:  Very little to say about the pattern.  It's free, clearly written, and straightforward.  I haven't had patience lately for complicated patterns, so this fit my mood pretty well.  There was enough going on to keep things interesting but nothing that required much thought.  The pattern is another one that's been in my Ravelry queue for years.  I'm loving clearing some of these out of there. Almost as satisfying as knitting down stash. Now that the socks are finished, I realize there are a few things I don't love about the design.  Like the way the cables merge together on the side into a tree trunk looking thing.


Or that narrow strip of reverse stockinette on part of the heel flap.  But, whatever.  Teeny tiny quibbles not worth wasting energy on.  Instead, I'm smiling just thinking about finished socks.  Buttery soft finished socks in luscious yarn.

Visit Tami's for more FO Friday!